Part Number: DD101 LONG LEAD | Manufacturer: Crl Components Inc | NSN: 5910-00-678-8157 (5910006788157) | Item Name : capacitor fixed ceramic dielectr | CAGE Code: 71590 | FSC: 5910 Capacitors | Alternate P/N : DD101LONGLEAD |
The DD101 LONG LEAD with NSN 5910006788157 is available in stock! Thanks for your interest in AerospaceSimplified.com. DD101 LONG LEAD, Capacitor Fixed Ceramic Dielectr part is manufactured by Crl Components Inc. Want to request a quote for it? Please fill the form below with contact details, expected delivery date, and quantity.
AerospaceSimplified.com is owned and operated by ASAP Semiconductor – a leading distributor of Crl Components Inc NSN parts in US. We stock ready-to-ship NSN parts from over 5000 manufacturers. We have headquarters in California, We can ship products the same day. A dedicated sales executive will contact you within 15 minutes of receiving the RFQ for DD101 LONG LEAD part. For even faster service you can call us at +1-714-705-4780. For multiple part number, you can email us your Bill of Materials (BOM) at sales@aerospacesimplified.com
For safe and secure sourcing on the go, download the ASAP Semiconductor app on Google Play or the Apple App Store.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item Description: Capacitor Fixed Ceramic Dielectr | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Dd101 Long Lead | 1 | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES, RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B- |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
Related NSN Part Numbers of DD101 LONG LEAD |
|||
---|---|---|---|
DD1-0 | DD1-00 | DD1-00 | DD1-5 |
DD10 | DD10-0 | DD100 | DD100 |
DD100 | DD100 | DD10000 | DD10018-1 |
DD1003 | DD10030300 | DD10040300 | DD10050300 |
DD100T | DD101 | DD101 | DD101 |
DD101 | DD101KS3N | DD102 | DD102 |
DD102 | DD102 | DD102 | DD102 |
DD102 | DD102 | DD102 | DD102G |
Glad You Chose Aerospace Simplified as Your Parts Distributor Website today. We Hope that You Will Remember Us the Next Time You’re Looking for Required Parts.
Request for Quote